PROJECT EXPERIENCE
Darraweit Guim Redevelopment
Value: $150m
Darraweit’s Estate is a planned community estate on a 260ha site located about 60km North of Melbourne. The masterplan of the estate is expected to deliver more than 3000 lots over the next 10 years.
Construction commenced late 2019 and will be home to over 7500 residents, with more than 56ha of public open space planned. The estate will include amenities such as a Town Centre, government primary school, private primary/secondary school with several open space precincts including sporting ovals and local parks.




Newcastle Residential Estate
Value: $100m
This prestigious residential estate is located on a rise between the Pacific Ocean, a protected wetland, established high end housing, and farmland, and was classified as a high value cultural heritage site.
Very strict environmental and construction constraints formed part of the DA requirements for the project and as such, high levels of environmental and cultural heritage management and protection were required throughout works.




Wollert Stage 1A
Value: $140m
Darraweit’s Estate is a planned community estate on a 260ha site located about 60km North of Melbourne. The masterplan of the estate is expected to deliver more than 3000 lots over the next 10 years.
Construction commenced late 2019 and will be home to over 7500 residents, with more than 56ha of public open space planned. The estate will include amenities such as a Town Centre, government primary school, private primary/secondary school with several open space precincts including sporting ovals and local parks.


Balliang Residential Estate
Value: $215m
Balliang Estate is a project located 30km west of Melbourne, offering more than 7000 lots.
More than 3500 lots have been completed since construction commenced in 2015. Construction is ongoing with 12 stages currently active comprising of sub-divisions, waterways, wetlands and open spaces. It is anticipated that construction will continue until at least 2027.
The estate includes amenities such as a Town Centre, Government primary/secondary schools, sports precincts, pharmacy and medical centres with multiple local parks in short proximity from every home. About 30 per cent of the Balliang footprint is dedicated to open space with significant efforts made to nurture and protect existing landscape.




Navigators Estate
Value: $90m
Master planned community in Navigators, Ballarat comprising of over 1100 lots plus retail, primary and secondary schools, sports precinct, wetlands and parklands.
Construction commenced in 2017, with over 600 lots already titled, and a further 140 under construction.




Yarra Estate
Value: $75m
Yarra Estate is a 162 Townhouse development, originally a dense forest in the heart of Yering, Victoria.
Green’s works involved building all authority and private services, roads and retaining walls on a difficult
foundation of sandy material, surrounded by long-term residents




Eastern Creek Speedway
Value: $32m
Our crew are carrying on with works on the Eastern Creek Speedway- the newest addition to the Eastern Creek Motorsport Park which features a world-class clay racetrack for cars and motorcycles alike.
Keen racing enthusiasts across Australia have already proven their immense excitement for this new and exciting racing destination to be fully up and running. The venue is set to host a massive 35 speedway events between September and June every year, attracting people from all around Australia and the rest of the world!
We can’t wait to see just how popular this destination is going to become!
The much-anticipated Sydney Speedway is back on track, works commenced mid-August with new government guidelines that allowed our crews back on site.
The new facility is set to see a new grandstand and terraced seating that will host 7000 spectators.
New workshops, garages, trackside support services, and a competitor pit area are being developed.
Race goers will see new public amenity upgrades to the track including food & beverage stands, merchandise booths, and corporate boxes.


Wind Farm
​
Value: $22m
We are really enjoying our involvement on the wind farm project south of Sydney. A beautiful earthworks project that will host some genuinely positive impacts for our future.
The project once complete will see:
A Clean and renewable source of energy.
An average annual energy production for approximately 215,000 homes.
​
Zero carbon emissions during operation
Increased knowledge of local plant and animal species through surveys, monitoring and protection.
Check out some of the progress images below





Marsden Park Wastewater Pump Station
Value: $7M
Under Sydney Water guidelines, GCC carried out all pipe works for a newly instated pump station. This consisted of4km of twin 560mm HDPE buttwelded pipeline pressure main in a live urban area among multiple operating contractors.
Undertook the construction of FRP 4 x 3m diameter x
12m deep sewer manhole as well as 200m of 900mm GRP sewer gravity.

Lithgow Raw Water Transfer Pipeline
Value: $5.5m
​
-
14.8km complex pipeline
-
Steep gradients (up to 38%)
-
4-10m working corridors
-
Butt fusion poly welding
-
Hydrotesting
-
Major rock trenching
​
Major contract for a Water Transfer Scheme from Springvale Coal Mine to a new Water Treatment Facility at Mount Piper Power Station (MPPS), operated by Energy Australia.
Green Civil Con’s scope of works included the installation of 710mm diameter HDPE, PN25 pipeline and dual communications conduits.
Our team commissioned and tested all pipeline components such as air valves, hydrants and scour valves.




Marsden Park Area
Value: $5.2M
​
The project involved the installation of a new sewer carrier to service the residential expansion and development in the Marsden Park area. The extension of the existing sewer network required the installation of approximately 1,530m of DN525 GRP pipe and 780m of DN225 PVC including modification and connection to the newly constructed SP1160.
The original design included bore shafts, manhole construction and trenchless pipe installation alongside newly constructed roadways of depth up to 11m. Of the 1,530m of DN525 GRP pipe, approximately 85% was originally designed to be bored however unexpected ground conditions prevented the progress of the drill heads and a process ensued to formulate a method and design which would allow completion without time implications.
GCC worked closely with the designers, developers and SWC to move mountains of dirt and redesign the project to open cut and install all pipe using conventional trenching methodologies. Bored section of pipe up to 10-11m deep were now open cut and concrete encased.
Despite the delays and major design changes, GCC was able to mobilise the crews and plant and complete the project and stay on program.
A difficult job but in the end a very satisfied and appreciative client.


Austral Bricks
Our pipe installation has been progressing nicely as we move from winter into spring at our Austral Bricks site in NSW.




Sydney Airport – Rehabilitation of Taxiway A&G
Value: $1m
This project involved the creation of a more streamlined movement of traffic through the International Terminal Carpark at Sydney Airport. Excavation and reinstatement of 8,500sqm of existing taxiway pavement during curfew hours.
GCC carried out the installation of 1.4km stormwater services in water charged ground and in-situ structures in time and on budget.


Sydney Business Park
Value: $15m
​
in 2014 GCC were contracted to work on the $15 million project at Sydney Business Park Developments.
Sydney Business Park is a world-class, privately owned, master-planned estate in Sydney’s north-west. GCC were heavily involved in ongoing stages of development.
Works included Sewer from DN150 to DN525 up to 8 m deep including DTC 1800 Manholes, 14 m High vent shafts and under road bores, Water from DN100 UPVC/DICL to DN315 HDPE, Valves and pits and a bore under Richmond Road, Stormwater works ranged from DN375 RCP to twin DN1500 RCP, RCBC, FRP large headwalls and installation of GPT’s.



Monaro Highway, ACT
Value: $850K
​
We completed works on the Monaro Highway Duplication in Fyshwick,
ACT, carrying out the relocation of 1283mm Bulk water main under a complex and detailed programme.
A time sensitive project that involved 24-hour shifts to allow crossing of the main arterial road to be completed over the Queen’s Birthday long weekend.
The project required extensive planning and our skilled crews to not only deliver the project, but the Green Civil Construction crew delivered it 24 hours ahead of schedule.
​



Oil & Gas Sulphate Removal Plant, VIC
Value: $7M
​
Construction of a 7,500 bbl/day water treatment plant for well completions.
Designed to reduce sulphate content in aquifer water used for enhanced oil recovery.
Implementation of the HIROX® plant technology for improved water recovery.
​



DROUIN WASTEWATER TREATMENT PLANT
Value: $16.5M
​
Construction of a wastewater treatment plant with a capacity of 1,500 cubic meters per day.
Installation of advanced filtration and purification systems to meet strict environmental standards.
Integration of automated monitoring and control systems for efficient operation.



BROGO WATER TREATMENT PLANT, VIC
Value: $18.4M
​
Construction of a water treatment plant with advanced filtration systems.
Installation of high-capacity pumps up to 1000m3 of capacity, pipelines, and storage tanks to ensure consistent water supply.
Integration of automated control systems for real-time monitoring and efficient management of water quality.
​



WOODGLEN WATER TREATMENT PLANT, VIC
Value: $8M
​
Construction of a water treatment plant with a capacity of up to 500 cubic meters per day.
Installation of essential filtration, chemical dosing, and disinfection systems to ensure high-quality water output.
Integration of automated monitoring and control systems for efficient plant operation.



GUNNING WATER TREATMENT PLANT, VIC
Value: $3.7M
​
Construction of a water treatment plant with a capacity of up to 500 cubic meters per day.
Installation of essential filtration, chemical dosing, and disinfection systems to ensure high-quality water output.
Integration of automated monitoring and control systems for efficient plant operation.



WALLAN WASTEWATER TREATMENT PLANT, VIC
Value: $13.5M
​
Implementation of the Intermittently Decanted Extended Aeration (IDEA) process to combine aeration and sedimentation in a single tank.
Construction and integration of sophisticated Tertiary Filters designed for high-quality water recycling, suitable for further Class A treatment.
Supply and installation of advanced mechanical equipment, including decanters and chemical dosing systems, to optimize plant efficiency.


WOODGLEN WATER TREATMENT PLANT, VIC
Value: $8M
​
Construction of a water treatment plant with a capacity of up to 500 cubic meters per day.
Installation of essential filtration, chemical dosing, and disinfection systems to ensure high-quality water output.
Integration of automated monitoring and control systems for efficient plant operation.



PINEWOOD POINT WASTEWATER TREATMENT PLANT, VIC
Value: $28.5M
​
The Pinewood Point Wastewater Treatment Plant Upgrade in East Ballarat, Victoria, is a $28 million project aimed at significantly enhancing the plant's capacity and operational efficiency. The upgrade involves 250,000 cubic metres of earthworks, 13,000 cubic metres of concrete, and 2,000 tonnes of reinforcement. It also includes the installation of 13,000 linear metres of piping and 2,000 tonnes of structural steel. This comprehensive project is designed to improve wastewater processing capabilities, ensuring effective treatment and compliance through a detailed commissioning phase.

